Breaking the Difficulty of High-altitude Maintenance! The world's first magnetic climbing crane goes into production
Innovation highlights
> Pain point solution
> Wind power/chemical tower tank maintenance has long existed:
> Traditional scaffolding construction takes more than 3 days
> The swing of the hanging basket operation affects the accuracy
> Safety risk level reaches SIL3
> Subversive solution
> ▶ Permanent magnetic adsorption chassis: vertical facade load-bearing 1.5t without falling off (12-level strong wind test passed)
> ▶ Bionic joint robot arm: 360° omnidirectional operation, positioning accuracy ±0.5mm
> ▶ Triple safety protection:
> - Redundant adsorption system automatically replenishes magnetism
> - Millimeter wave radar anti-collision
> - Real-time warning of overturning moment
> Application prospects
> Orders have been received from the world's top 3 wind power operators, and the first batch of equipment will be used for the maintenance of 90-meter offshore wind turbine blades in the North Sea